Technical Services Management
In order to have a holistic assessment of the buildings Technical Systems the appointment of an Independent Technical Services Manager is crucial to the success of the project.
Digest contract details / meet clients team
Create cost schedule demonstrate “like for like” costing
Analyse tender returns, expose hidden potential and value engineering
Split Packages to find better buying
Interview tenders
Selections
Manage the design & build and CDP process
Attend design meetings with the client team
Chair design and co-ordination meetings
Obtain and monitor procurement
Monitoring of RFI and Technical Submission schedules
Tech Subs to be reviewed against ER’s
Review design drawings against ER’s and building fabric, including builder works drawings
Review Statutory Authorities quotation in line with Project requirements
Co-ordinate with the utility companies and managing the installation of new and upgrading of services
Monitor utilities installation into buildings, including chairing meetings
Chairing M & E co-ordination meetings as required, with all necessary sub-contractors and professional team members.
Review with sub-contractor and co-ordination the working to provide construction drawings and technical information for the project
Manage MEP and specialist sub-contractors
Monitor MEP Programme in line with site construction progress, indicating by a drop down line showing the current progress
Ensuring that the MEP installation programme is updated in line with the construction programme
Review and comment on sub-contractors progress report when issued and responding accordingly
Chair and record progress and co-ordination meetings
Liaise and interface with the client and construction team on the requirement for MEP services
Monitor and co-ordinate the delivery of statutory authorities services in line with the construction programme
Updating and issuing of a utility tracker in line with works completed on site
Monitor the installation to ensure it is compliant to the ER’s
Regularly carry out and issue a schedule of defects/ snagging items on an on-going basis in conjunction with the design team.
Closing out the defect and signing of completed works before void closers are completed
Witnessing of construction testing of Building control, Pressure testing and Dead testing throughout the construction process
Issue non-conformance reports if applicable
Ensuring that works is signed off and closed out
Site wide quality inspections, issuing a photo report of outstanding defects
High Level Witness Overview
Please see separate document below for independent commissioning manager
Co-ordinate the issue of O&M and ensure all the information required is correct and up to date
Follow up on any outstanding items or changes required
Ensure that all labelling and charts are installed and correct
Review as installed drawings to ensure they are in line with the completed construction
Review certification issued and in line with the ER’s and Specification
Co-ordinate the consultant witnessing
Co-ordinate the client training with the required M&E sub-contractors is completed and recorded
Ensure all certificates and are completed and up-to-date
Close out any outstanding items or defects